Homepage
  History
  Environment / Quality
  References / Certificate
  On the road in Hungary
  On the road in Sweden
  On the road in Poland
  The Öresund bridge
  Certificates
  Contracting
  Product range
  Application methods
  Thermoplastic
Download the MSDS files by choosing from the list below:
 

  Download the Operating
Manual files by choosing
from the list below:
 

  Paint and Primer
Download the MSDS files and
Product Overview by choosing
from the list below:
 


Hightech connection
The Öresund bridge, totaling 16 kilometres in length is excellent proof of what advanced engineering skills and co-operation across borders can achieve. There has been an ambition to build the bridge for the past 100 years. Taking five years to build, it connects Denmark and Sweden and is the world's longest suspension bridge carrying both motorway and train traffic.

Road marking material used: thermoplastic. Application by extrusion. The material was specially developed to give it a long lifespan. Cleanosol therefore guaranteed its function for 5 years (the material was to maintain a certain minimum value as regards retro-reflection, SRT and QD). And tests have subsequently shown that the markings have, during the guarantee period, proved to have exceeded these requirements. Clearly this is good news for Cleanosol and our clients; Skanska and the Öresund Bridge Consortium.

The generally held conclusion is unanimous: By using a high quality thermoplastic, it is possible to guarantee the functionality of a road marking for many years. Fewer interruptions and road closures provide more satisfied users and a safer traffic environment.


  New Product 35E20L
The product 35E20L which was tested last year in the Baltic States has this year, 2008 got a commercial breakthr...
  Test Field
Cleanosol took end may sucessfully part at the official test program in the Czech Republic.The products 37S20T...